PROGRAMME OF EVENTS
When once the decision had been mase to dig a new pool a programme of events had to be established due to the existing pool and fish. Firstly I had to decide how to keep the existing fish safe until the new pond was completed.
1
ERECT TEMPORARY POOL
2
CONNECT FILTER
3
FILL TEMPORARY POOL WITH WATER
4
RUN FILTER ETC
5
TRANSFERE A COUPLE OF GOLD FISH AFTER A WEEK
6
KEEP AN EYE ON GOLD FISH FOR TWO MORE WEEKS
7
IF EVERYTHING ALRIGHT, PUMP WATER OUT OF
EXISTING POOL AND TRANSFER KOI TO NEW TEMPORARY POOL
8
PUT COVER ON NEW TEMPORARY POOL
9
REMOVE ALL WATER FROM EXISTING POOL THEN REMOVE
ALL MUD AND DEBRIE
10
REMOVE FLANGE FROM BOTTON DRAIN
11
REMOVE OLD LINER
12
REMOVE BULGE FROM BACK WALL OF POOL AND EXAMINE
BEHIND
13
IF OK, DIG OUT SOIL TO NEW SIZE
14
LAY CONCRETE FOOTING FOR NEW WALL ACROSS END AND
AT THE BACK
15
LEAVE CONCRETE FOOTING TO SET FOR A COUPLE OF
DAYS
16
BUILD WALL AROUND TOP OF POOL TO HEIGHT OF
CONCRETE PAD
17
INSTALL NEW SECOND BOTTOM DRAIN AND CONCRETE IN
PLACE.
18
ORDER BOX WELDED LINER
19
INSTALL UNDERLAY & NEW LINER
20
INSTALL FLANGES TO BOTTOM DRAINS (SEAL)
21
LAY CAPPINGS ON TOP OF LINER (WHERE APPLICABLE)
22
UPON COMPLETION OF FILTERS ETC, FILL POOL WITH
WATER.